The I5 Real Estate Delivery Model is validated by global case studies and rigorous research. This section highlights real-world examples that demonstrate the principles of productization, Design for Manufacture and Assembly (DfMA), and Just-In-Time (JIT) delivery in action.

Validation Overview

Global Validation Study
18 case studies conducted across 9 countries validating I5 Model benefits
25-35%
Faster Delivery
15-25%
Cost Savings
±2%
Cost Variance
50-70%
Fewer Defects

Countries Studied:

United Kingdom
Sweden
Singapore
China
Japan
United States
Canada
Saudi Arabia
Australia

These aggregated results demonstrate the transformative potential of the I5 Model's synthesis of productization and IPD, validating its ability to accelerate market entry, reduce revenue realization time, and minimize rework.

Research Foundation

This comprehensive reference base demonstrates the robust academic and industry foundation underlying the I5 Real Estate Delivery Model, providing credible validation for its methodologies and expected benefits.

34+
Total References
18
Case Studies
9
Countries
15+
Academic Papers

Methodology Examples

Productization
Industry examples illustrating key productization principles that are integral to the I5 Model's approach

Design for Manufacture and Assembly (DfMA)
Examples demonstrating the effective implementation of DfMA principles in construction

Just-In-Time (JIT) Delivery
Examples highlighting the application of JIT principles in construction supply chains

Key Project Case Studies

The Clement Canopy
Singapore
A project in Singapore that exemplifies mandated modular construction through Prefabricated Prefinished Volumetric Construction (PPVC)

Methods Used:

Emphasized early stakeholder coordination and planning

I5 Relevance:

Aligns with I5's focus on rigorous process planning and stage-gate reviews

Dubai Municipality Pilot 6-Floor Project
Dubai, UAE
Dubai Municipality issued its first modular construction license for this pilot project

Methods Used:

Modular construction approach

I5 Relevance:

Demonstrates the UAE's openness to innovation in construction, aligning with the I5 Model's focus on off-site construction

Sutter Medical Center Castro Valley
California, USA
An IPD project case study

Methods Used:

Integrated Project Delivery principles, fostering strong collaboration

I5 Relevance:

The I5 Model incorporates IPD principles, which have shown projects are 3 times more likely to complete ahead of schedule and 2.5 times more likely to complete under budget

References

Research & Industry References
Academic papers, industry reports, and standards supporting the I5 Model

Academic Journals & Research Reports

  • Akintoye, A., et al. "Customer Satisfaction Metrics in Modular Construction." Construction Management and Economics
  • Ashcraft, H. W., & Reed, D. "Integrated Project Delivery: Performance Metrics and Financial Analysis." Journal of Construction Engineering and Management
  • Bertelsen, S., & Koskela, L. "Construction Beyond Lean: A New Understanding of Construction Management." Journal of Construction Engineering and Management
  • Chapman, C., & Ward, S. "Project Risk Management: Processes, Techniques and Insights." Journal of Project Management
  • Chen, Q., et al. "Interface Management in Construction: Industrialized Building Systems." International Journal of Project Management
  • Cooper, R. G. "Stage-Gate Systems for New Product Development in Construction." Research-Technology Management
  • Eastman, C., et al. "BIM Handbook: A Guide to Building Information Modeling." Wiley & Sons
  • Flyvbjerg, B. "What You Should Know About Megaprojects and Why: An Overview." Project Management Journal
  • Goulding, J. S., et al. "DfMA Implementation in Construction: Labor Impact Analysis." Journal of Architectural Engineering
  • Jaillon, L., & Poon, C. S. "Quantifying the Waste Reduction Potential of Using Prefabrication in Building Construction in Hong Kong." Waste Management
  • Koskela, L., et al. "Concurrent Engineering in Construction: Time-to-Market Analysis." Journal of Construction Engineering and Management
  • Liker, J. K. "The Toyota Way: Process Design Impact Analysis in Construction." McGraw-Hill Education
  • Smith, R. E. "Prefab Architecture: A Guide to Modular Design and Construction." Wiley & Sons
  • Tommelein, I. D. "Just-In-Time Delivery in Construction: Field Storage Reduction Case Studies." Construction Management and Economics
  • Womack, J.P., & Jones, D.T. "Lean Thinking: Banish Waste and Create Wealth in Your Corporation." Productivity Press